HDD Project Representative
| Location: | United Kingdom |
| Work Type: | Contract |
| Start Date: | 1st January 2026 |
| Duration: | 36 Weeks |
UTM Consultants are looking for a Representative, to assist our client with their EGL1 HDD project offshore, UK.
We are looking for someone that will be involved in one of the two sea-land HDD projects. Please note that we are looking for candidates with strong HDD experience.
The works will be carried out by HDI that is the subcontractor of Prysmian.
We are looking for a professional that will be able to follow:
• the initial engineering phase, reviewing the documentation provided by HDI and making sure it is approved by the end customer (National Grid - SSE) – Monday to Friday, 8 hours per day, remotely based
• the site activities, including the site set up and the drilling until the completion of the works – 7/7, 10-12 hours per day, site based
• the as built documentation - Monday to Friday, 8 hours per day, remotely based.
The engineering works are already ongoing but should start to be more intense from the starting of the new year.
The site works should start in April and be completed in September 2026.
We are looking for someone that will be involved in one of the two sea-land HDD projects. Please note that we are looking for candidates with strong HDD experience.
The works will be carried out by HDI that is the subcontractor of Prysmian.
We are looking for a professional that will be able to follow:
• the initial engineering phase, reviewing the documentation provided by HDI and making sure it is approved by the end customer (National Grid - SSE) – Monday to Friday, 8 hours per day, remotely based
• the site activities, including the site set up and the drilling until the completion of the works – 7/7, 10-12 hours per day, site based
• the as built documentation - Monday to Friday, 8 hours per day, remotely based.
The engineering works are already ongoing but should start to be more intense from the starting of the new year.
The site works should start in April and be completed in September 2026.
The project is due to start on 1st January 2026 and will last approx. 36 weeks
| Reference Number: | 15692 |
| Contact Details: | ff@utmconsultants.com |
| Profession: | Renewable Energy |